Consultations in Name Only

Recent public consultations by Transport for London (TfL) have typically omitted any costs, or cost/benefit information, about the proposed schemes. For example on the “Safer Speeds” proposals for many more 20 mph speed limits in London, or Cycleway schemes. Nor do they ask a simple question as to whether people support the proposals overall or not.

I complained about those omissions in the ABD’s response to TfL and got a note back from Esme Yuill (Lead Consultation and Project Communications) which contained much waffle but did say “consultation is not usually about the principle of a project, but the proposed design”. In other words, the consultation is usually based on the project being a fait accompli and TfL have already decided to push ahead with it. That is not a consultation in the usual sense of the word, and clearly undermines the democratic principle that consultations should not assume pre-conceived notions.

Indeed this approach is contradictory to that laid down by the Government in their Consultation Principles where it says: “Consult about policies or implementation plans when the development of the policies or plans is at a formative stage”. See https://tinyurl.com/ycb3mwvk

That document also says: “Give enough information to ensure that those consulted understand the issues and can give informed responses. Include validated impact assessments of the costs and benefits of the options being considered when possible…..”. Neither of the recent consultations I referred to in my complaint (the “Safe Speeds for Central London” and the “Wood Lane/Notting Hill Gate” schemes) contained any costs or cost/benefit analysis and that has been a consistent omission in recent TfL consultations.

TfL has been one of the most impervious and undemocratic bodies since it was set up by Ken Livingstone. They do not listen to anyone. Indeed was it not Ken Livingstone who said “Consultation is a good thing when people agree with you, and a waste of time when people don’t agree with you” and TfL are clearly still following that principle. By avoiding consulting on the key questions as to whether projects should be done at all, and not informing respondents on the costs and cost/benefits, they are avoiding any meaningful consultation.

Is that the way that you think the body that runs transport in London and has one of the biggest budgets in the world should run consultations? I do not and I will be pursuing this matter.

Roger Lawson

Twitter: https://twitter.com/Drivers_London

You can “follow” this blog by clicking on the bottom right.

2 thoughts on “Consultations in Name Only

  1. For the Rotherhithe Bridge consultation TfL fabricated the BCR. At the time of the consultation in November 2017 the initial cost of the bridge was analysed by TfL at £182m – £274m. In order to demonstrate the Bridge was a more viable option than the Ferry, TfL used a low cost of only £19m. Sadiq Khan was made aware of this in April 2018, but continued to support the bridge and spend Taxpayer funds until June 2019.

  2. Pingback: Consultations in Name Only and “Safer Speeds” | Alliance of British Drivers (ABD) London